Underground Utilities Archives - W.M. LYLES CO. /project-category/underground-utilities/ Heavy-Civil & Utility Contractor Fri, 23 Jan 2026 23:01:50 +0000 en-US hourly 1 /wp-content/uploads/2024/04/cropped-WML-logo-site-icon-32x32.png Underground Utilities Archives - W.M. LYLES CO. /project-category/underground-utilities/ 32 32 Wasco Water District, Wasco Stored Water Recovery Unit /project/wasco-water-district-wasco-stored-water-recovery-unit/ Mon, 29 Apr 2024 20:57:34 +0000 /?post_type=dt_portfolio&p=1688 The post Wasco Water District, Wasco Stored Water Recovery Unit appeared first on W.M. LYLES CO..

]]>
Stored Water Recovery Program Wasco CA2

Wasco Water District, Wasco Stored Water Recovery Unit

Underground Utilities

Wasco Stored Water Recovery Unit

Wasco, California

Design-Builder of the District’s $200M Stored Water Recovery Unit Program. This overall program, delivered in phases, provides an east-west connection between the California Aqueduct and the District’s Pond-Poso Canal System, allowing the bidirectional conveyance of up to 720cfs of water. The initial phase consisted of a $47M project which included the following features: 38,000LF of 120” RCP pipeline, 144” tunnel crossing of Hwy 5, aqueduct turnout, 12,000HP junction reservoir pumping plant, concrete-lined canal and forebay, reservoir spillway with adjustable weir structure, connection channel check structure with reverse flow pumps and electrical/instrumentation. Subsequent projects within the program include a 1.0MW electrical generation facility that utilizes tracking photovoltaic solar panels, raw water processing plant, various pipeline expansions to include additional water banking areas, pumping plant energy recovery and piping interties.

Contract Amount: $81,500,000

Stored Water Recovery Program Wasco CA3
Stored Water Recovery Program Wasco CA1

The post Wasco Water District, Wasco Stored Water Recovery Unit appeared first on W.M. LYLES CO..

]]>
Semitropic Water Storage District, Stored Water Recovery Unit Phase 2K-XYZ Intertie Project /project/semitropic-water-storage-district-stored-water-recovery-unit-phase-2k-xyz-intertie-project/ Fri, 26 Apr 2024 20:25:28 +0000 /?post_type=dt_portfolio&p=1664 The post Semitropic Water Storage District, Stored Water Recovery Unit Phase 2K-XYZ Intertie Project appeared first on W.M. LYLES CO..

]]>
Semitropic SWRU Phase 2 K, XYZ Intertie Project2

Semitropic Water Storage District, Stored Water Recovery Unit Phase 2K-XYZ Intertie Project

Underground Utilities

Semitropic Water Storage District, Stored Water Recovery Unit Phase 2K-XYZ Intertie Project

Wasco, California

߲ݴý. was the prime contractor on this progressive design-build project that connected portions of the District’s X, Y, and Z Distribution Systems in order to provide irrigation water to an additional 3500 acres of orchards and row crops. The project included the installation of 18,900LF of 30” to 36” RCP pipelines, 30,200LF of 18” to 27” PVC pipelines, 23 landowner farm turnouts and two 100cfs booster pump stations.

Contract Amount: $8,520,184

Semitropic SWRU Phase 2 K, XYZ Intertie Project1
Semitropic SWRU Phase 2 K, XYZ Intertie Project3
Semitropic SWRU Phase 2 K, XYZ Intertie Project4

The post Semitropic Water Storage District, Stored Water Recovery Unit Phase 2K-XYZ Intertie Project appeared first on W.M. LYLES CO..

]]>
The Regents of the University of California, UC Merced /project/the-regents-of-the-university-of-california-uc-merced/ Thu, 25 Apr 2024 20:21:32 +0000 /?post_type=dt_portfolio&p=1657 The post The Regents of the University of California, UC Merced appeared first on W.M. LYLES CO..

]]>
The Regents of the University of Calif UC Merced 2020 Proj1

The Regents of the University of California, UC Merced

Underground Utilities

The Regents of the University of California, UC Merced

Merced, California

WML partnered with Webcor Builders to provide subcontracting services to support the delivery of the UC Merced 2020 Project which nearly doubles the size of the existing UC Merced campus by adding 13 buildings with supporting infrastructure, featuring 1.2M gross square feet of classroom, research, student life, housing and faculty office space. The $1.3B Design-Build-Operate-Finance project utilized the P3 (Public-Private-Partnership) delivery method.

W.M. ߲ݴý Co.’s subcontracting scope of work included 19,000LF of 4”-16” domestic/fire water piping, 12,500LF of 4”-20” chilled water piping, 4,000LF of 3”-8” gas piping, 3,500LF of 4”-14” reclaimed water piping, 11,500LF of 4”-21” sanitary sewer piping, 2,000LF of 8” sewer force main piping, and over 26,000LF of 6”-36” storm drain piping. Other work included concrete retaining walls, storm drain headwalls / outfalls, manholes, catch basins, demolition of existing utilities/structures, sanitary sewer lift station, over 400,000LF of conduit duct bank / pathway for power, IT, emergency blue phone system, lighting, security, traffic signals, and wireless access points including the concrete foundations for over 450 light fixtures.

Contract Amount: $57,442,031

The Regents of the University of Calif UC Merced 2020 Proj2
The Regents of the University of Calif UC Merced 2020 Proj3

The post The Regents of the University of California, UC Merced appeared first on W.M. LYLES CO..

]]>
Antelope Valley East Kern Water Agency, Westside Water Agency, Phase 2 Well Equipping and Treatment Site Modifications /project/antelope-valley-east-kern-water-agency-phase-2/ Tue, 08 Oct 2019 18:30:24 +0000 https://wmlylesco.flywheelsites.com/?post_type=dt_portfolio&p=540 Design-Builder of the $126M Tesoro Viejo Water/Wastewater Program. The Program will service the development’s 5,200 dwellings, the 3.0 Million sf industrial and commercial space, schools, hospital, parks, open spaces and trails. The Water/Wastewater Program is being delivered in stages in order to coincide with the anticipated growth of the development.

The post Antelope Valley East Kern Water Agency, Westside Water Agency, Phase 2 Well Equipping and Treatment Site Modifications appeared first on W.M. LYLES CO..

]]>
Water Treatment hero

Antelope Valley East Kern Water Agency, Westside Water Agency, Phase 2 Well Equipping and Treatment Site Modifications

Water Treatment

Antelope Valley East Kern Water Agency, Westside Water Agency, Phase 2 Well Equipping and Treatment Site Modifications

Palmdale, California

This project involved the installation of two new deep well pumps with associated piping, valves, flow meters and electrical. Including development of two well sites with fencing, sumps, and surfacing. New steel chemical injection manifold and tie into existing storage tank. This project includes new Solar Bee tank mixing equipment and hydro pneumatic skid and controls.

Contract to Date: $29,978,536

A9R1lhx4d9 sm0wja 16v0
A9Rmginci sm0wip 16v0

The post Antelope Valley East Kern Water Agency, Westside Water Agency, Phase 2 Well Equipping and Treatment Site Modifications appeared first on W.M. LYLES CO..

]]>